An update to the Swim the Thames schedule:

Swim #52 changed to Saturday 3rd August 2013 to avoid the Prudential RideLondon

and some minor corrections:
Swim #51 end point changed to Chertsey Meads (For those doing a catchup)
Swim #52 start point changed to Chertsey Meads & end point changed to Desborough Island (We're going the long way following the original Thames route.)
Swim #53 start point changed to Desborough Island
Swim #54 & #55 Molesey spelling correction from the previous somewhat fascist version :o)
Some dates for your diaries for those not on Facebook.

Here are the proposed dates for Thames swims to take us to the end of the Non Tidal Thames at Teddington:

(Sat 20Jul) OSS Swim the Thames #50 Runnymede Bell Weir Lock to Penton Hook (Camp @Cormac's) - Done

(Sun 21Jul) OSS Swim the Thames #51 Penton Hook Lock to Chertsey Meads - Done
(Sat 03Aug) OSS Swim the Thames #52 Chertsey Meads to Desborough Island
(Sat 17Aug) OSS Swim theThames #53 Desborough Island to Sunbury Lock (Camp - somewhere?)
(Sun 18Aug) OSS Swim the Thames #54 Sunbury Lock to Molesey Lock
(Sun01Sep) OSS Swim the Thames #55 Molesey Lock to Kingston Bridge
(Sun22Sep) OSS Swim the Thames #56 Kingston Bridge to Teddington Obelisk- The End!

Full details will be send for each swim soon but if you would like to camp at Runnymede for a weekend of swimming  please let me know.  I'm trying to book the same camp at Runnymede we used last time but there will be a limited number of spaces.

Jeremy & Sef